The study on the productivity to enhance the construction industry master plan implementation /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2012.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01346cam a2200301 a 4500 | ||
---|---|---|---|
001 | u869945 | ||
003 | SIRSI | ||
005 | 201212141616 | ||
008 | 121214s2012 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ | ||
043 | |a a-my--- | ||
090 | |a Q180 |b UMP 2012 Nikanma | ||
097 | |a Q180 |b UMP 2012 Nikanma | ||
100 | 0 | |a Nik Afifah Nik Mohd Adeeb. | |
245 | 1 | 4 | |a The study on the productivity to enhance the construction industry master plan implementation / |c Nik Afifah binti Nik Mohd Adeeb. |
260 | |c 2012. | ||
300 | |a xxv, 358 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D) -- Institut Pengajian Siswazah, Universiti Malaya, 2012. | ||
504 | |a Bibliography: leaves 311-333. | ||
650 | 0 | |a Construction industry |z Malaysia |x Management. | |
650 | 0 | |a Construction industry |x Labor productivity |z Malaysia. | |
650 | 0 | |a Construction industry |x Capital productivity |z Malaysia. | |
710 | 2 | |a Universiti Malaya. |b Institut Pengajian Siswazah. | |
900 | |a AT-ZA | ||
596 | |a 1 7 | ||
999 | |a Q180 UMP 2012 NIKANMA |w LC |c 1 |i A515365213 |d 22/10/2013 |f 22/10/2013 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 18/10/2013 | ||
999 | |a Q180 UMP 2012 NIKANMA |w LC |c 1 |i A515834614 |d 1/7/2014 |f 1/7/2014 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 4/6/2014 | ||
999 | |a Q180 UMP 2012 NIKANMA |w LC |c 2 |i A515839259 |d 1/7/2014 |f 1/7/2014 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 1/7/2014 |