Using overall equipment effectiveness and value stream mapping to improve productivity : a case study in Vietnam /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2012.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01532cam a2200313 a 4500 | ||
---|---|---|---|
001 | u870435 | ||
003 | SIRSI | ||
005 | 201212191630 | ||
008 | 121219s2012 my a t 000 0 eng m | ||
040 | |a UMM | ||
043 | |a a-vt--- | ||
090 | |a TS176 |b UM 2012 Ngu | ||
100 | 1 | |a Nguyen, Truong Son. | |
245 | 1 | 0 | |a Using overall equipment effectiveness and value stream mapping to improve productivity : |b a case study in Vietnam / |c Nguyen Truong Son. |
246 | 1 | |i Cover and spine title: |a Using overall equipment effectiveness and value stream mapping for productivity improvement : a case study in Vietnam | |
260 | |c 2012. | ||
300 | |a x, 145 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, 2012. | ||
504 | |a Bibliography: leaves 139-145. | ||
650 | 0 | |a Lean manufacturing |z Vietnam. | |
650 | 0 | |a Manufacturing processes |x Equipment and supplies. | |
650 | 0 | |a Source reduction (Waste management). | |
650 | 0 | |a Waste minimization |z Vietnam. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
900 | |a US-ZA | ||
596 | |a 1 7 | ||
999 | |a TS176 UM 2012 NGU |w LC |c 1 |i A515292799 |d 29/6/2019 |e 29/6/2019 |f 19/6/2013 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 19/6/2013 | ||
999 | |a TS176 UM 2012 NGU |w LC |c 1 |i A515564744 |d 16/7/2013 |f 16/7/2013 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 16/7/2013 | ||
999 | |a TS176 UM 2012 NGU |w LC |c 2 |i A515574358 |d 16/7/2013 |f 16/7/2013 |g 1 |l COUNTER |m P07JURUTER |r Y |s Y |t CD |u 16/7/2013 |