Developing a project learning model considering fragmentation in construction /

Saved in:
Bibliographic Details
Main Author: Alashwal, Ali Mohammed
Format: Thesis Book
Language:English
Published: 2012.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/6165
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01245cam a2200301 a 4500
001 u884015
003 SIRSI
005 201307161059
008 130716s2012 my a t 000 0 eng m
040 |a UMAB  |d AUM  |e rda 
043 |a a-my--- 
097 |a TH145  |b UMP 2012 Ala 
100 1 |a Alashwal, Ali Mohammed. 
245 1 0 |a Developing a project learning model considering fragmentation in construction /  |c Ali Mohammed Alashwal. 
260 |c 2012. 
300 |a xviii, 300 leaves :  |b ill. ;  |c 30 cm. 
502 |a Thesis (Ph.D) -- Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, 2012. 
504 |a Bibliography: leaves 253-269. 
650 0 |a Construction industry  |z Malaysia. 
650 0 |a Construction industry  |x Management. 
650 0 |a Construction industry  |x Finance. 
650 0 |a Project management  |z Malaysia. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/6165 
900 |a AT-ZA 
596 |a 11 25 
999 |a TH145 UMP 2012 ALA  |w LC  |c 1  |i A513057506  |d 8/8/2018  |e 26/6/2018  |f 8/8/2018  |g 1  |l STACKS  |m P11ALMBINA  |n 1  |r Y  |s Y  |t TESIS  |u 22/5/2014  |1 STEM 
999 |a TH145 UMP 2012 ALA  |w LC  |c 1  |i A517697712  |f 28/7/2023  |g 1  |l STACKS  |m P25UMARCHI  |r N  |s Y  |t CD  |u 28/7/2023  |1 STEM  |o .STAFF. MST-CD7001