Preventive Maintenance of cement grinding machine in LAO cement company /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2014.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01450cam a2200349 i 4500 | ||
---|---|---|---|
001 | u990351 | ||
003 | SIRSI | ||
005 | 201402271157 | ||
008 | 140227s2014 my a t 000 0 eng m | ||
040 | |a UMM |b UMJ |e rda | ||
090 | |a TJ7 |b UM 2014 Lat | ||
097 | |a TJ7 |b UM 2014 Lat | ||
100 | 1 | |a Lattanasim, Vongsavang, |e author. | |
245 | 1 | 0 | |a Preventive Maintenance of cement grinding machine in LAO cement company / |c Vonsavang Lattanasim. |
264 | 1 | |c 2014. | |
264 | 4 | |c 2014. | |
300 | |a xi, 73 leaves : |b illustration ; |c 30 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b M.Eng. |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya |d 2014. | ||
504 | |a Bibliography: leaves 50-51. | ||
650 | 0 | |a Plant maintenance |x Planning. | |
650 | 0 | |a Maintenance |x Equipment and supplies | |
650 | 0 | |a Industrial equipment |x Maintenance and repair. | |
650 | 0 | |a Production scheduling. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Mekanik, |e degree granting institution. | |
900 | |a HA-ZA | ||
596 | |a 1 7 | ||
999 | |a TJ7 UM 2014 LAT |w LC |c 1 |i A515861892 |d 15/10/2014 |f 15/10/2014 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 13/10/2014 | ||
999 | |a TJ7 UM 2014 LAT |w LC |c 1 |i A516157424 |d 24/3/2015 |f 24/3/2015 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 24/3/2015 | ||
999 | |a TJ7 UM 2014 LAT |w LC |c 2 |i A516157509 |d 24/3/2015 |f 24/3/2015 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 24/3/2015 |