An efficiency improvement of flexible flow shop scheduling problem in automotive part company /
Saved in:
Main Author: | Fangrit, Waraporn (Author) |
---|---|
Format: | Thesis Book |
Language: | English |
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and development of hot press metal forming using KUKA robot /
by: Addam Paat
Published: (2013) -
Vision-guided mobile robot navigation system /
by: Gonzales, Julirose
Published: (2007) -
Design and development of a vision guided mobile robot /
by: Herianto
Published: (2007) -
Design and development of an automated painting system for automotive industry /
by: Mohd Azim Che Ab Rahman Zaki
Published: (2013) -
Modelling, identification and hybrid force-position control of robot-assisted orthopaedic surgery system /
by: Sallah, Azeddien Mo
Published: (2012)