Balancing and scheduling of car floor subassembly production flow line /
In a mass production environment where shared resources, restricted task assignments and parallel processing are present, the concept of line balancing and scheduling can play a pivotal role in framing optimal operational decisions. Though this approach is widely referred in OR and/or OM literature...
محفوظ في:
المؤلف الرئيسي: | Kays, H. M. Emrul |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
Kuala Lumpur :
Kulliyyah of Engineering, International Islamic University Malaysia,
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://studentrepo.iium.edu.my/handle/123456789/4366 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Design of a suitable inspection sampling plan for mitigating the quality related problems at IC production line /
بواسطة: Nornilawati binti Hj. Yusop
منشور في: (2012) -
Rapid assembly lines model building based on template approach and classification of problems using the cladistics technique /
بواسطة: Zainal Rasyid Mahayuddin
منشور في: (2012) -
Designing for assembly and manufacturability /
بواسطة: Tan, Seng Hai
منشور في: (1990) -
Mitigation of bulllwhip effect in Integrated Manufacturing-Remanufacturing Supply Chain (IMRSC) : system dynamics perspectives /
بواسطة: Kays, H. M. Emrul
منشور في: (2018) -
An integrated model for production line balancing planning
بواسطة: Ali, A. J. Adham
منشور في: (2012)