Optimal timetable synchronization for greater Kuala Lumpur using mixed integer programming / Saiyidatul Adidah Idris
Greater Kuala Lumpur transportation system (GKL) operates 11 rail lines and 192stations. Passengers using GKL often missed the next connecting train to their destination. They also frequently must rush to catch this train. This problem may have been caused by unsynchronized tabling of train schedule...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/35200/1/35200.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|