A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transforme...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Online Access: | https://ir.uitm.edu.my/id/eprint/84482/1/84482.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|