A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
Currently, the planning arId scheduling of Royal Malaysian Navy (RMN) ships for preventive maintenance routine, i.e. Slipping, DED and Refit at shipyard, is done based on the existing policy cycle which has the constraint that a maximum of 1/3 of the total number of ships could undergo maintenan...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1993
|
Subjects: | |
Online Access: | http://eprints.usm.my/30643/1/MAHAMUD_SAYUTI_ABD._HALIM.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|