A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships

Currently, the planning arId scheduling of Royal Malaysian Navy (RMN) ships for preventive maintenance routine, i.e. Slipping, DED and Refit at shipyard, is done based on the existing policy cycle which has the constraint that a maximum of 1/3 of the total number of ships could undergo maintenan...

Full description

Saved in:
Bibliographic Details
Main Author: Abd. Halim, Mahamud Sayuti
Format: Thesis
Language:English
Published: 1993
Subjects:
Online Access:http://eprints.usm.my/30643/1/MAHAMUD_SAYUTI_ABD._HALIM.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!