Construction of precast segmental box girder bridge using overhead gantry - a case study

The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...

全面介紹

Saved in:
書目詳細資料
主要作者: Salleh @ Mohamed Salleh, Jazlan
格式: Thesis
語言:English
出版: 2006
主題:
在線閱讀:http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!