Creep and thermal response of long span prestressed concrete integral abutment bridge
Integral Abutment Bridges (IAB) are getting popular due to significant cost savings in their construction and maintenance. Many countries stipulate the use of IABs in their new bridge construction projects but mostly the span is limited to 60 m. The limit is set considering the concerns on the long-...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79228/1/AkiluMuhammadPFKA2017.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|